Welcome to the largest knowledge repository on Tonle Sap Basin!  
  Member Sign In | Become a Member
Select language: 
English
 
   
 
 
» About Tonle Sap
» Common Policy and Strategy
» Projects and Programmes
TSEMP
TSBR-ED
TSBR-ED Team
TSCP
Related Projects
Donors Around Tonle Sap
» Key Sectors & Issues
» Partners
» NGO Network
» Contact Us
 
 
 
  Home | Projects and Programmes | TSCP  
 
 
Tonle Sap Conservation Project (TSCP) - Documents

Purpose of project

The Tonle Sap Conservation Project (TSCP) is integrated within Component 3 of the larger Tonle Sap Environment Management Project (TSEMP). However, the TSCP has its own project management and technical teams, and is independently budgeted. The TSCP aims at developing the management capacity for biodiversity conservation in the Tonle Sap Biosphere Reserve through:
1) enhancing the capacity for management of biodiversity in the TSBR's Core Areas;
2) developing systems for monitoring and management of biodiversity, and
3) promoting awareness, education and outreach on biodiversity conservation in the TSBR.

Key Outputs

TSCP has three key outputs based on its objectives:
1. Capacity for management of biodiversity in the Core Areas is increased
2. Systems for management and monitoring of biodiversity are developed
3. Awareness, education and outreach on biodiversity conservation in the TSBR are promoted

Project Summary Sheet UNDP Cambodia(TSCP)

 
  TSCP - Articles  
  Article 1: Kenya tour
Article 2: Bangladesh tour
Article 3: Livelihood
Article 4: Core area planning
Article 5: A school contest for PT CAMP
Article 6: Summary from BTC planning workshop
Article 7: Boundary demarcation for SS
Project summary for UNDP
TSCP leaflet-June 2007

 

Documents
  Document Title Published Date File Size
TONLE SAP CONSERVATION PROJECT: STATUS AS OF SEPTEMBER 2006
SEPTEMBER 2006
37.5KB
A Survey of Boeung Tonle Chmar Core Area of the Tonle Sap Biosphere Reserve
October 2006
97 KB
OPTIONS AND STRATEGY FOR SUSTAINABLE LIVELIHOODS SUPPORT
May 2006
392 KB
Training Development Programme Report
June, 2006
1.3MB
INCEPTION REPORT FINDINGS AND RECOMMENDATIONS FROM THE PROJECT INCEPTION PERIOD, JANUARY – JUNE 2005
June 2005
1.5 MB
1st field trip to Prek Toal, Tonle Sap and Siem Reap of Robert van Zalinge for the Invasive Species Project
July 2006
30 KB
TRAINING DEVELOPMENT PROGRAMME: TRAINING NEED ASSESSMENT FOR RANGER GROUP
JANUARY 2006
175KB
INFORMATION REQUIREMENTS FOR PEAM REANG SURVEY
Apr 06
32 KB
UNDP GEF APR/PIR 2006 - BIODIVERSITY
7 July 2006
107KB
Workshop on Sustainable Livelihoods Strategy Kompong Chhnang, 21 March 2006
21 March 2006
59.1KB
Field trip report on consultation with fishermen in Prek Toal Core Area
01- 08 October 2006
24KB
JTF Funding forlivelihood integrated with TSCP
240 KB
Project profile in English version
2.31MB
Project profile in Khmer version
2.47MB
Strategy Workshop Report 31 March
10.5 KB
Training Report 2006-2007
62,902kb
 
 
 
  Visitors: 2855662  
   
 
Copyright © 2006 Tonle Sap Biosphere Reserve Secretariat
Optimised at 1024x768 with I.E. 4.x & above